O Hazir, N Ozdamar, B Yasar, IS Yilmaz (2020). Practices and Future of Earned Value Management: Insights from Turkey , Journal of Yaşar University 15-59 (426-443) Click Here for The Paper
2024 Publications “Exposure to Economic Distress during Pregnancy and Birth Outcomes”, (with M. Akbulut-Yuksel, E. Tekin and B. Turan)
2024 Publications Dincer, A. E., Dincer, N. N., Tekin-Koru, A., Yaşar, B., & Yılmaz, Z. (2024). The Impact of Kahramanmaraş (2023) Earthquakes: A Comparative Case Study for Adıyaman and Malatya. International Journal of Disaster Risk Reduction, 104647
2023 Publications Usul, N., & Yılmaz, I. S. (2023). Corporate Sustainability: The Use of ESG Scores in Finance Research. In Corporate Sustainability as a Tool for Improving Economic, Social, and Environmental Performance (pp. 1-23). IGI Global.
2023 Publications Dincer, N.N., Pektekin, P., & Tekin-Koru, A. (2023). “Long Shadows of the Walking Dead on Economic Activity,” Central Bank Review, 23(4), 100140.